The insulation has now mostly been installed and the cabling is all complete ready for plastering. We had New Home Inspections out again for a pre-plaster inspection. Theo found a few minor issues again which should be all corrected by the time the bricks are complete. Then it will be a week of tidying up and sorting out some loose ends, lock the doors and start plastering. If all goes well we should be completed plastering by the end of the month. We are still mostly looking on track.
The only major issue we've encountered so far is an oversight by Ashford in not contacting TTI about our granite bench tops. I had a call from TTI asking what was going on, have called Elisha at Ashford and hoping it will all be sorted. It seems that most people now go for Caesar stone and so they don't really know what to do when confronted with natural stone. Ashford seem to always come through for us with a bit of probing so hopefully this issue will be no different. I've been reading a few blogs of people building with Metricon and we don't seem to be having any of the issues they are, I think its probably a combination of having a stable SS who is on the ball and also having the independent inspections.
Brickwork outside the dinning room
Plasterboard ready to go in the dinning room. Wall and ceiling insulation all installed.
A completed wall on the master bedroom.
External wall insulation and phone and power points.
Sound screen insulation between the retreat and bedrooms.
Cornices ready to go in once the plaster is up.
Bit of dodgy plumbing here that needs to be sorted out.